The Pentagon
Contents |
[edit] Introduction
The Pentagon is the headquarters of the United States Department of Defence and one of the largest office buildings in the world. Located in Arlington County, Virginia, it has become a symbol of military power.
The Pentagon was designed by architect George Bergstrom and built by contractor John McShain. It provides around 600,000 sq.m (6.5 million sq.ft) of accommodation, of which 340,000 sq.m (3.7m sq.ft) serve as offices for approximately 23,000 military and civilian employees.
A large defence hub was urgently needed during the Second World War. Initially, President Roosevelt was said to favour a building without windows to protect against possible air raids, although he was persuaded otherwise by engineers, in favour of the five-sided design by Bergstrom.
The building has five storeys above ground, two levels below ground, and five ring corridors per floor, creating a total of 17.5 miles (28.2 km) of corridors. It has a height of 23 m (77 ft), and each of the five sides is 281 m (921 ft) long.
‘Ground Zero’ was the nickname for the central plaza measuring five acres (20,000 sq. m), because it was presumed to be a major target for the Soviet Union during the Cold War.
[edit] Design and construction
Bergstrom was forced to use an asymmetrical five-sided shape for his design because of the position of existing roads on the site. The site itself previously contained housing occupied by the descendants of former slaves. However, it was not large enough for the massive complex being planned, and so a further 150 families were evicted from their homes and their land appropriated.
Because the site is located on the floodplain of the Potomac River, the ground conditions presented a number of engineering challenges. So too did the varying elevations across the site, which ranged from 3-12 m (10-40 ft) above sea level.
One of the first design stipulations was that the building be no taller than five storeys due, in part, to concerns over disrupting the views to and from the Virginia site and nearby Washington D.C. Another reason was because of the steel shortage as a result of the ongoing war effort.
Ground was broken and construction began on September 11 1941. It was built as a reinforced concrete structure, using 680,000 tons of sand dredged from the nearby Potomac River.
As a result of the urgent need for the building, the architectural and structural design work proceeded simultaneously with construction, with construction overtaking design at certain points, the result being that different materials were used from those specified in the plans. A workforce of more than 15,000 worked on the project around the clock, and the first employees moved in to the complex before it was completed.
Construction took place at a time when there was legally-mandated racial segregation. As a result, the building has twice the number of toilet facilities needed, separated by race as well as gender.
The construction of the Pentagon was completed in approximately 16 months, and dedicated on 15 January 1943. The pressure to complete however, meant that costs had spiralled from $35m up to $63m.
[edit] Post-completion
The Pentagon became synonymous with protests during the Cold War, and particularly during the Vietnam War.
The Pentagon underwent a major renovation, beginning in 1998. This involved bringing the building up to modern standards, removing asbestos, improving security, and sealing all office windows. This meant the original system of cross-ventilation from openable windows had to be replaced with air conditioning.
On September 11 2001, on the 60th anniversary of the building's construction beginning, a hijacked airliner was flown into the western side of the Pentagon, killing 189 people. In the aftermath of the attack, the Phoenix Project was launched, a repair and renovation initiative, completed in February 2003 at a cost of some $5bn. In 2008, a memorial garden was opened to the public.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.
A brief run down of changes intentions from April in an onwards.
Reslating an ancient water mill
A rare opportunity to record, study and repair early vernacular roofs.
CIOB Apprentice of the Year 2025/26
Construction apprentice from Lincoln Mia Owen wins this years title.
Insulation solutions with less waste for a circular economy
Rob Firman, Technical and Specification Manager, Polyfoam XPS explains.
Recycled waste plastic in construction
Hierarchy, prevention to disposal, plastic types and approaches.
UK Net Zero Carbon Buildings Standard V1 published
Free-to-access technical standard to enable robust proof of a decarbonising built environment.
Prostate Cancer Awareness Month
Why talking about prostate cancer matters in construction.
The Architectural Technology podcast: Where it's AT
Catch up for free, subscribe and share with your network.
The Association of Consultant Architects recap
A reintroduction and recap of ACA President; Patrick Inglis' Autumn update.
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.